Started with covering the ceiling and wall panels. Jen picked out some vinyl wallpaper for this. Lots of brushing and rolling.



I secured the wiring in the over-cab cabinet and added some stiffening ribs. Covers for the wiring and speakers were also made.




The cabinets are finally painted and I mounted the Blum soft-close hinges. These have some hold-closed force. We will see if additional latching is needed (probably). The hold open and soft close features are really nice.


I installed the bedside cabinet as well. Plumbing is installed. Wires are run, but not connected yet. I have 12V and USB charge ports as well as overhead lighting control. Once I get the forward shower hookup attached I can do a final leak check, and call the water system done! So close... And I managed to scratch the cabinet somehow... Grrrrr.



No comments:
Post a Comment